Chobham Farm, Leyton

Background 

Anderson Acoustics was commissioned by Fairview New Homes in October 2023, on behalf of applicant Anglia Secure Homes (South East) Limited, to provide planning stage noise, vibration and air quality assessments for this development at Chobham Farm, 150 Leyton Road, Stratford, E15 1DT.

The project involves transforming a former industrial yard into a vibrant mixed-use development comprising 106 residential units and 196 m² of commercial space, with a strong emphasis on sustainability and environmental compliance. 

What we did 

Acoustics site feasibility study 

As part of the Robin process, we undertook an acoustics site feasibility study and provided outline acoustic advice so Fairview could understand the noise and vibration constraints of the site and account for indicative construction costs of the scheme. 

The survey results informed the initial recommendations and technical specifications required for the site to be suitable for residential use. 

BS 8233:2014 Guidance on sound insulation and noise reduction for buildings was the most relevant Standard in terms of noise and the scope of our assessment.    

Planning noise and vibration assessment 

As the site is subject to noise from nearby road, rail and commercial sources, a noise impact assessment was deemed necessary to confirm the extent of mitigation measures that may be required to provide a policy compliant scheme. 

Our assessment followed the ProPG Stage guidance covering good acoustics design, internal ambient noise levels, noise levels in external amenity areas and overheating and ventilation considerations.  

The ProPG was jointly developed by the Institute of Acoustics (IOA), the Association of Noise Consultants (ANC) and the Chartered Institute of Environmental Health (CIEH) to guide Local Planning Authorities (LPA’s) and Practitioners in assessing the suitability for residential development on sites predominantly exposed to airborne transport noise. 

We reviewed the current design proposals confirming that:- 

  • the external building fabric proposals will be sufficient to control external noise ingress to habitable spaces if the recommended glazing and ventilation systems are installed 
  • alternative ventilation measures would be required for some apartments to control overheating
  • recommended plant noise limits would protect the residents of the development and those living near to it against future plant noise emissions

The outcome of our assessment demonstrated that the proposed external building fabric design will ensure internal ambient noise levels are compliant with the criteria in ProPG and Approved Document O. Our recommendation was to “Grant consent with suitable noise conditions”. 

Air Quality Assessment 

Our assessment accomplished the following: 

  • Evaluate baseline air quality conditions to establish site suitability
  • Assess the impact of the proposed development on local air quality 
  • Determine the site’s suitability for residential and commercial use 
  • Ensure compliance with national and local air quality policies 
  • Develop a dust risk management plan
  • Demonstrate compliance with air quality neutral and positive planning policies

Development Impact 

  • The development is considered “car-free” with only four blue badge electric vehicle charging bays
  • Heating and hot water will be supplied via an off-site District Heat Network using air source heat pumps (ASHP), eliminating on-site combustion emissions
  • The impact on local air quality is classified as “negligible,” with no significant increase in pollutant concentrations

Dust Risk Assessment 

The site was assessed as: 

  • Medium risk for dust soiling during demolition, earthworks, construction, and trackout prior to mitigation
  • Low to negligible risk for human health impacts

A robust mitigation strategy was proposed, including: 

  • Real-time dust monitoring
  • Site layout planning to minimize exposure 
  • Use of low-emission machinery and sustainable construction practices 

Air Quality Neutral and Positive Assessment 

We concluded that the development meets and exceeds the benchmarks for air quality neutrality. It qualifies as “air quality positive” due to: 

  • Elimination of combustion-based heating
  • Provision of secure cycle storage and EV charging
  • Inclusion of green infrastructure to absorb pollutants 

Project Progress 

On 23rd July 2024 planning approval for Chobham Farm was granted unanimously by Newham Council and the London Legacy Development Corporation (LLDC).

We'd love to hear from you

How can we add value to your project? Is there something we can help you with?

London: 0203 176 7909 Hove: 01273 696 887 Manchester: 07711 009 794 [email protected]

Connect with us

Institute of Acoustics Employee Ownership Association Living Wage Foundation Constructionline Builder's Profile Premium Acclaim SSiP UKAS ISO 9001: 2015    ISO 14001: 2015 Cyber Essentials Plus British Aviation Group UK Green Building Council Design in Mental Health Network Noise Network Plus