82-84 Kingsland High Street, Dalston

Background 

Anderson Acoustics was appointed to assess  groundborne  vibration and  re‑radiated  noise from the proposed Crossrail 2 tunnels in support of a residential redevelopment at 82–84 Kingsland High Street, Dalston.

The assessment was undertaken to discharge a planning condition and  demonstrate  compliance with Crossrail 2 safeguarding requirements. 

The Challenge 

The site is  located  within the Crossrail 2 safeguarding limits, with the tunnel alignment positioned  immediately  adjacent to  the eastern site boundary. The proposals involved new residential apartments constructed above a retained  ground‑floor  retail unit, creating a sensitive acoustic environment. 

The key challenge was to  demonstrate  that operational vibration and  re‑radiated  noise from future Crossrail 2 services would not adversely affect internal residential conditions, using an assessment approach acceptable to both the Local Planning Authority and Crossrail 2 consultees. 

Our Approach 

A detailed vibration and  re‑radiated  noise assessment was completed  in accordance with  the  Crossrail 2 Tunnel Section Information for Developers (April 2021). The  methodology  focused on predicting vibration transmission from subterranean train  pass‑bys  through the ground and into the building structure. 

The assessment combined Crossrail 2 reference vibration data with  site‑specific  geological information, tunnel geometry and foundation details provided by the project structural engineer. 

Vibration levels were derived using reference data representative of train movements in proximity to the proposed Dalston station, where train speeds are expected to be reduced. Ground propagation losses were calculated using London Clay parameters informed by borehole investigation data. 

Building response was assessed conservatively, incorporating reinforced concrete raft and ribbed slab foundations with high amplification assumptions in line with ANC guidance.  Re‑radiated noise levels were assessed within the nearest first floor apartment, representing  the  worst‑case  residential receptor. 

The Outcome 

The predicted maximum  re‑radiated  noise level was  32 dB  LAmax,fast, achieving the Crossrail 2 residential criterion of  35 dB  LAmax,fast  with a 3 dB margin. This result was achieved despite the use of intentionally conservative assumptions throughout the assessment. 

Given the compliant  re‑radiated  noise predictions, operational tactile vibration levels were also considered likely to remain within relevant guidance limits. No  additional  vibration mitigation or enhanced soundproofing measures were  required  to support the proposed development. 

Conclusion 

This assessment provided robust,  evidence‑based  support for residential development  adjacent to  safeguarded rail infrastructure. By applying recognised guidance, conservative modelling  assumptions  and  site‑specific design information, we demonstrated that acceptable internal noise and vibration conditions can be achieved for future residents. 

Project Progress 

Hackney Borough Council discharged planning condition 7 related to Noise and Vibration on 21st April 2026.  

We'd love to hear from you

How can we add value to your project? Is there something we can help you with?

London: 0203 176 7909 Hove: 01273 696 887 Manchester: 07711 009 794 [email protected]

Connect with us

Institute of Acoustics Employee Ownership Association Living Wage Foundation Constructionline Builder's Profile Premium Acclaim SSiP UKAS ISO 9001: 2015    ISO 14001: 2015 Cyber Essentials Plus British Aviation Group UK Green Building Council Design in Mental Health Network Noise Network Plus