Land at Barge Way, Sittingbourne

Background 

Anderson Acoustics was commissioned by DHA Planning to develop a Transport Emissions Mitigation Strategy (TEMS) for a proposed development at Barge Way, Sittingbourne. 

The project aimed to discharge Condition 3 of the planning application 21/504208/FULL, which required measures to reduce transport-related air pollution during both the construction and operational phases of the development.

Project Overview 

The development involved creating two open storage facilities with associated access, parking, landscaping, and other works. The site, located in Kemsley, Sittingbourne, was an undeveloped plot of 0.86 hectares. The project included the provision of 16 car parking spaces, 12 cycle parking spaces, and two electric vehicle (EV) charging points. 

Key Policy and Guidance 

The TEMS was developed in accordance with several key policies and guidance documents, including: 

  • SBC Air Quality and Planning Guidance 
  • Kent & Medway Air Quality Partnership Guidance 
  • Defra Low Emission Strategy Guidance IAQM Guidance on Dust Risk 

Baseline Air Pollutant Concentrations 

The site was located near two Air Quality Management Areas (AQMAs) in Sittingbourne. Baseline measurements indicated that NO2 concentrations were below the annual mean objective in recent years. 

Development Emissions Details 

The development’s transport emissions were calculated using the Emissions Factor Toolkit (EFT). The assessment considered both construction and operational phases, with specific measures to mitigate emissions. 

Mitigation Measures 

Several mitigation measures were proposed to reduce emissions, including: 

  • Installation of two 7 kW EV fast chargers 
  • Provision of secure cycle parking 
  • Implementation of a dust management plan during construction 
  • Use of green infrastructure, such as tree planting 

Emissions Damage Costs 

The emissions damage costs were calculated for both construction and operational phases and the proposed mitigation measures were sufficient to meet these costs. 

Conclusion 

The TEMS for the Land at Barge Way, Sittingbourne, successfully addressed the requirements of the planning condition and relevant air quality guidance. The proposed mitigation measures ensured that the development would minimize its impact on air quality, promoting sustainable and low-emission transport options. 

Project Progress 

On 7th January 2025, Swale Borough Council approved the details pursuant to Condition 3 (transport related air pollution).

We'd love to hear from you

How can we add value to your project? Is there something we can help you with?

London: 0203 176 7909 Hove: 01273 696 887 Manchester: 07711 009 794 [email protected]

Connect with us

Institute of Acoustics Employee Ownership Association Living Wage Foundation Constructionline Builder's Profile Premium Acclaim SSiP UKAS ISO 9001: 2015    ISO 14001: 2015 Cyber Essentials Plus British Aviation Group UK Green Building Council Design in Mental Health Network Noise Network Plus